14: Form Work
15: Form Work
16: Bobcat In Mud
17: Wall forms
18: Bay Window is out
19: Temporary shoring of Master Bedroom
20: Lumber is here !
21: Dan Janicki - Of Janicki Construction
22: Tarp in place
23: 22' micro-Lam beam to hold up master bedroom and new roof.
24: Micro-Lam Beam support at existing Steel Beam
25: Beam From The East
26: Underside of the beam - two 9'' deep plus two 16'' deep micro-lam's bolted together.
27: Jack to lift master bedroom after year's of settling.
28: Ooops, jacked a little too high and cracked wall where master bedroom attaqches to old exterior wall.
29: Claire & Kevin
30: Claire & Kevin
31: The last existing wall is now gone so the micro-lam is spanning the full 22'.
32: Beam
Back To Top
Window Info